  • Des Moines University, Ryan Hall Addition

    Des Moines University, Ryan Hall Addition

    This addition to Ryan Hall on the Des Moines University campus houses the Standardized Performance Assessment Laboratory (SPAL). SPAL is a learning...

  • Des Moines University, Student Education Center

    Des Moines University, Student Education Center

    The Student Education Center serves as the hub of the Des Moines University campus. The $24 million, 150,000 square foot facility houses a medical...

  • Drake University, Cole Hall

    Drake University, Cole Hall

    This project involved the complete renovation of an 8,000 square foot classroom building into the admissions office for Drake University. The renovation...

  • Drake University, Cowles Library

    Drake University, Cowles Library

    Neumann Brothers renovated and restored the original part of the Drake University library in the heart of campus. The project included creating...

  • Drake University, Legal Clinic

    Drake University, Legal Clinic

    This project added two floors to an existing legal educational facility on the Drake University campus in Des Moines, including a two-story atrium...

  • Drake University, Sheslow Auditorium

    Drake University, Sheslow Auditorium

    The renovation of Sheslow Auditorium in Drake University's historic Old Main building included replacing the floor, replastering, repainting throughout,...

  • Earlham Bank - Keo Way Location

    Earlham Bank - Keo Way Location

    Neumann Brothers redesigned and transformed the Greyhound Bus Station structure in downtown Des Moines in to a full-service branch complete with...

  • Earlham Savings Bank, Woodward, IA

    Earlham Savings Bank, Woodward, IA

    Neumann Brothers completely renovated and remodeled a vacant location in Woodward, IA. The interior remodel of space included closing the open...

  • Easter Seals Camp Sunnyside

    Easter Seals Camp Sunnyside

    This 7,600 square foot, energy-efficient facility at Easter Seals' Camp Sunnyside is a Butler building with clear span structural components. The...

  • EFCO Manufacturing Plant 2

    EFCO Manufacturing Plant 2

    Economy Forms of Des Moines contracted Neumann to build a new concrete form manufacturing plant in 2008 adjacent to their existing campus. The...